Skip to content
Still from the official video of The Amaryllis (Phases 2 and 3)

The Amaryllis (Phases 2 and 3)3 and 4 BHK flats in Karol Bagh, Delhi

By Unity Group (Basant Projects Ltd) in Karol Bagh, Central Delhi. Under construction.

  • PriceOn request
  • PossessionJun 2023RERA date
  • Homes3, 4 BHK
  • RERARegisteredDLRERA2018P0007 +1

The listed handover date has passed and we can't confirm it's ready, so it isn't shown on the map. Check the current status with the builder.

Sources checked 18 Oct 2026 Sources: the builder's page and RERA filings We take no commission or fee if you buy How we check projects

Report a correction

Official videos from The Amaryllis Central Delhi - Offical on YouTube. Press play to watch here.

Phases 2 and 3 of a high-rise complex on New Rohtak Road. RERA completion dates in 2023 have passed; construction updates continue to Q3 2026.

Homes in this project

3 BHK
size not listed
Price on request
4 BHK
1,579–2,239 sq ft carpet
Price on request

Price note: No price published on the builder site (theamaryllis.in), checked 18 Oct 2026

Key facts

The Amaryllis (Phases 2 and 3)

Promoter
Unity Group (Basant Projects Ltd)
RERA reg. no.
DLRERA2018P0007, DLRERA2018P0011
Completion
Jun 2023 (RERA date)
Homes
3, 4 BHK · 227 homes
Check it
Delhi RERA website

As listed in our sources, checked 18 Oct 2026. Not an official document: check the registration on the RERA website before you pay.

HandoverJun 2023 (RERA date)
StatusUnder construction
RERA registrationDLRERA2018P0007
DLRERA2018P0011
Homes in project227
Listed amenitiesskywalk, swimming pool, jogging track, skating rink, clubhouse, concierge
How sure we areHigh: the builder's page and RERA filing data (what this means)

Where it is

The Amaryllis (Phases 2 and 3), Karol Bagh

Drive to major office hubs

  • Connaught Place ~15 min typical · ~18 min at rush hour · 5.4 km by road
  • Netaji Subhash Place ~25 min typical · ~30 min at rush hour · 9.3 km by road
  • Jasola District Centre ~45 min typical · ~53 min at rush hour · 18.8 km by road
  • Sectors 16 to 18, Noida, Noida ~47 min typical · ~57 min at rush hour · 20.5 km by road
  • Nehru Place ~49 min typical · ~59 min at rush hour · 17.8 km by road
  • Aerocity and Delhi Airport ~49 min typical · ~58 min at rush hour · 18.0 km by road
  • Saket District Centre ~50 min typical · ~60 min at rush hour · 19.9 km by road
  • Okhla Industrial Area ~52 min typical · ~62 min at rush hour · 19.1 km by road

Drive times start from OpenStreetMap road routes. Routing assumes empty roads, so we slow them down until the middle trip runs at the average and rush-hour speeds in the TomTom Traffic Index 2025. Treat them as a guide and try the drive at the hour you would commute.

How it compares with new projects nearby

Swipe the table to compare

ProjectFromPer sq ftPossessionAway
The Amaryllis (Phases 2 and 3) (this one) On request – Jun 2023 –
Godrej Connaught One ₹24.29 Crbuilder · GST and charges extra ₹1,95,700 carpet Ready 3.3 km
Rizon One On request – Jan 2027 ~3.4 km approx.

Lowest listed prices. Some include GST and charges and others don't, so check each project's price note. Per sq ft keeps carpet and super built-up (SBA) apart, so compare like with like.

Where these details come from

  • theamaryllis.in: RERA numbers DLRERA2018P0007/DLRERA2018P0011, '3 4 5 BHK Luxury Apartments' page title, skywalk with swimming pool, jogging track, skating rink and play area, The Club, site address near Jeevan Mala Hospital, Karol Bagh; footer names Basant Projects Limited (checked 18 Oct 2026)
  • theamaryllis.in: Phase 2 & 3: 31-storey towers linked by a 20th-floor skywalk, concierge services; 4-bedroom floor plans with carpet areas 1,579 to 2,239 sq ft (5 and 6-bedroom plans also shown) (checked 18 Oct 2026)
  • theamaryllis.in: quarterly construction updates listed up to Quarter III 2026 (checked 18 Oct 2026)
  • aurumproptech.in republished RERA filings: Delhi RERA record (rera.delhi.gov.in timed out on 2026-10-18; read via the PropTech Pulse mirror of the register): Phase II, promoter Basant Projects Ltd, Karol Bagh, land 22900 sq m, 54 four-BHK units and 2 penthouses, completion 31-01-2023, status On going (checked 18 Oct 2026)
  • aurumproptech.in republished RERA filings: Delhi RERA record (rera.delhi.gov.in timed out on 2026-10-18; read via the PropTech Pulse mirror of the register): Phase III, New Rohtak Road, Karol Bagh, land 16178.41 sq m, 111 three-BHK, 56 four-BHK and 4 penthouses, completion 30-06-2023, status On going (units_total 227 is the sum of both registrations) (checked 18 Oct 2026)
  • openstreetmap.org: OpenStreetMap area 'The Amaryllis' (residential apartments) in Karol Bagh; its centre is used for the pin (checked 18 Oct 2026)

Ask the builder for the current price sheet, and check the registration on the Delhi RERA website before you book. This page is general information, not legal, tax or financial advice.

Keep exploring

The Amaryllis (Phases 2 and 3): questions buyers ask

What is the price of a 3 BHK in The Amaryllis (Phases 2 and 3)?

We haven't found a published price for the 3 BHK. Ask the builder for the current price sheet.

What is the price of a 4 BHK in The Amaryllis (Phases 2 and 3)?

We haven't found a published price for the 4 BHK (1,579–2,239 sq ft carpet). Ask the builder for the current price sheet.

When is possession of The Amaryllis (Phases 2 and 3)?

Jun 2023 (RERA date). Dates can be extended, so check the current date on the RERA record.

What is the RERA number of The Amaryllis (Phases 2 and 3)?

The Amaryllis (Phases 2 and 3) is registered with Delhi RERA under DLRERA2018P0007, DLRERA2018P0011.

Where is The Amaryllis (Phases 2 and 3)?

The Amaryllis (Phases 2 and 3) is in Karol Bagh, Delhi. The nearest major office hub is Connaught Place, about 15 minutes' drive in typical traffic (5.4 km by road).

Who is the builder of The Amaryllis (Phases 2 and 3)?

The Amaryllis (Phases 2 and 3) is built by Unity Group (Basant Projects Ltd).

General information, not legal, tax or financial advice.

Official siteLocation